Equipment Condition Assessment
Fertiliser plant · Gujarat
Fired heater, 28 years old
- Problem
- Unit approaching design life with no prior RLA on record
- Constraint
- Assessment had to be completed ahead of the next statutory inspection
- Scope executed
- In-situ replica metallography at high-risk locations
- Ultrasonic thickness mapping
- Residual life estimate and fitness-for-service report
- Outcome
- Unit cleared for continued operation with a defined re-inspection interval, ahead of the statutory inspection deadline
- Documentation delivered
- RLA report
- NDT records
- Fitness-for-service recommendation
- Duration
- 4 days on site
- Team size
- 2 NDT technicians, 1 engineer