Relocation & Reinstallation

Shifting a boiler is a dismantling job, a transport job and an erection job that all have to line up. We run it as one project — from a single boiler move to a complete boiler-house or plant relocation — with safe dismantling, transport and permit coordination, and full recommissioning at the new site.

Services in this division

Scope of work

Dismantling & transport

  • Systematic dismantling with part-tagging and photographic record
  • Route survey and permit coordination for oversized loads
  • Coordination with heavy-lift transport contractors

Erection & recommissioning

  • Foundation coordination and structural / pressure part re-erection at the new site
  • Complete boiler-house relocation — boiler, BOP, utilities and structure together
  • Hydrostatic testing, IBR re-registration and recommissioning

Equipment we work on

Type

Makes

Capacity range

Water tube boilerall makes1–100 TPH
Fire tube / smoke tube boilerall makes500 kg/hr – 15 TPH
Process machinery & pressure equipmentall makesany
Material handling equipmentall makesany

How we execute

  1. Survey

    Source and destination sites surveyed — access, foundation, statutory requirements at both ends.

  2. Method statement

    Dismantling, transport and re-erection plan issued, including permits and civil interface with your team.

  3. Dismantling & transport

    Equipment dismantled with part-tagging, then transported to the new site under the agreed route and permits.

  4. Erection

    Structural and pressure part re-erection, piping and BOP reinstatement, refractory relining where required.

  5. Recommissioning

    Hydrostatic test, IBR re-registration, performance trial and handover with full documentation.

Documentation you receive

  • Dismantling record with part-tagging and photographs
  • Transport permits and route survey
  • Erection QA/QC records
  • Hydrostatic test certificate
  • IBR re-registration documents at the new site

Typical turnaround

Dismantling (single boiler)1–2 weeks
Transport (intra-state / inter-state)3–10 days
Re-erection & recommissioning3–6 weeks
Full boiler-house relocation, door to door8–16 weeks

Frequently asked

Yes — IBR registration is site-specific. We handle the re-registration process, including the inspection the authority requires before commissioning.

Part-tagging at dismantling, correct packing and bracing, and route survey to avoid load and clearance issues — a photographic record is kept at every stage.

We coordinate transport and heavy-lift logistics through our contractor network — confirm current arrangements with our team for your specific route and load.

Either — a single-unit boiler move and a complete boiler-house relocation (boiler, BOP, utilities, structure together) are both standard scopes; see Boiler House Relocation.

If it's one of several units, yes. For a single-boiler plant, the dismantling window is scheduled against your production shutdown.