Relocation & Reinstallation
Shifting a boiler is a dismantling job, a transport job and an erection job that all have to line up. We run it as one project — from a single boiler move to a complete boiler-house or plant relocation — with safe dismantling, transport and permit coordination, and full recommissioning at the new site.
Services in this division
Boiler Relocation
Dismantling, transport and re-erection, run as one project.
Boiler Dismantling
Systematic, tagged, and photographed — so nothing gets lost in transit.
Boiler Transportation
Route survey, permits and coordination for an oversized, expensive load.
Boiler Reinstallation
Erection, tie-ins and recommissioning at the new site.
Complete Boiler House Relocation
Not just the boiler — the boiler, BOP, utilities and structure together.
Plant & Machinery Relocation
The same relocation discipline, applied beyond the boiler house.
Scope of work
Dismantling & transport
- Systematic dismantling with part-tagging and photographic record
- Route survey and permit coordination for oversized loads
- Coordination with heavy-lift transport contractors
Erection & recommissioning
- Foundation coordination and structural / pressure part re-erection at the new site
- Complete boiler-house relocation — boiler, BOP, utilities and structure together
- Hydrostatic testing, IBR re-registration and recommissioning
Equipment we work on
Type | Makes | Capacity range |
|---|---|---|
| Water tube boiler | all makes | 1–100 TPH |
| Fire tube / smoke tube boiler | all makes | 500 kg/hr – 15 TPH |
| Process machinery & pressure equipment | all makes | any |
| Material handling equipment | all makes | any |
How we execute
Survey
Source and destination sites surveyed — access, foundation, statutory requirements at both ends.
Method statement
Dismantling, transport and re-erection plan issued, including permits and civil interface with your team.
Dismantling & transport
Equipment dismantled with part-tagging, then transported to the new site under the agreed route and permits.
Erection
Structural and pressure part re-erection, piping and BOP reinstatement, refractory relining where required.
Recommissioning
Hydrostatic test, IBR re-registration, performance trial and handover with full documentation.
Documentation you receive
- Dismantling record with part-tagging and photographs
- Transport permits and route survey
- Erection QA/QC records
- Hydrostatic test certificate
- IBR re-registration documents at the new site
Typical turnaround
| Dismantling (single boiler) | 1–2 weeks |
| Transport (intra-state / inter-state) | 3–10 days |
| Re-erection & recommissioning | 3–6 weeks |
| Full boiler-house relocation, door to door | 8–16 weeks |
Frequently asked
Yes — IBR registration is site-specific. We handle the re-registration process, including the inspection the authority requires before commissioning.
Part-tagging at dismantling, correct packing and bracing, and route survey to avoid load and clearance issues — a photographic record is kept at every stage.
We coordinate transport and heavy-lift logistics through our contractor network — confirm current arrangements with our team for your specific route and load.
Either — a single-unit boiler move and a complete boiler-house relocation (boiler, BOP, utilities, structure together) are both standard scopes; see Boiler House Relocation.
If it's one of several units, yes. For a single-boiler plant, the dismantling window is scheduled against your production shutdown.