Boiler Revamp & Retrofit
Capacity Enhancement
More steam from the boiler you already have.
Capacity uprating recovers throughput within — or by carefully extending — the existing pressure part envelope, usually cheaper than adding a new boiler for incremental demand growth.
What’s included
- Steam generation (TPH) uprating
- Pressure part upgradation
- Heat recovery unit replacement — economiser, air preheater
- HP heater installation
- Burner upgradation to support the higher firing rate
Frequently asked
Depends on pressure part margin and draft system headroom — the pre-engineering survey and combustion assessment gives the real number.
Capacity changes typically require updated IBR documentation — handled as part of the engineering and handover scope.
Sometimes the shell or drum is the limiting factor — we'll tell you that upfront rather than force a design that doesn't hold.
Need this scoped for your site?
Request a site survey, or call the breakdown desk if it’s active.
More in Boiler Revamp & Retrofit
Division overview
Boiler Revamp & Retrofit →