24×7 breakdown desk+91 90000 00000
Svedha Engineering

Boiler Revamp & Retrofit

Capacity Enhancement

More steam from the boiler you already have.

Capacity uprating recovers throughput within — or by carefully extending — the existing pressure part envelope, usually cheaper than adding a new boiler for incremental demand growth.

What’s included

  • Steam generation (TPH) uprating
  • Pressure part upgradation
  • Heat recovery unit replacement — economiser, air preheater
  • HP heater installation
  • Burner upgradation to support the higher firing rate

Frequently asked

Depends on pressure part margin and draft system headroom — the pre-engineering survey and combustion assessment gives the real number.

Capacity changes typically require updated IBR documentation — handled as part of the engineering and handover scope.

Sometimes the shell or drum is the limiting factor — we'll tell you that upfront rather than force a design that doesn't hold.

Need this scoped for your site?

Request a site survey, or call the breakdown desk if it’s active.