Relocation & Reinstallation
Boiler Dismantling
Systematic, tagged, and photographed — so nothing gets lost in transit.
Dismantling isn't demolition — every component that has to go back together at the other end is tagged, photographed and packed for its specific re-erection sequence.
What’s included
- Site survey and dismantling plan before work starts
- Mechanical dismantling with part-tagging and photographic record
- Pressure part and structural steel dismantling
- Piping, ducting and BOP disconnection
- Electrical / instrument disconnection
- Heavy-component handling, packing and protection
Frequently asked
1–2 weeks typically, depending on capacity and how much of the BOP is moving with it.
Flagged in the dismantling record — refractory rarely survives intact and is budgeted for replacement at re-erection, not treated as a surprise.
Yes — dismantling can be arranged as part of a Used Boiler Purchase, not only a full relocation project.
Need this scoped for your site?
Request a site survey, or call the breakdown desk if it’s active.