Relocation & Reinstallation

Boiler Dismantling

Systematic, tagged, and photographed — so nothing gets lost in transit.

Dismantling isn't demolition — every component that has to go back together at the other end is tagged, photographed and packed for its specific re-erection sequence.

What’s included

  • Site survey and dismantling plan before work starts
  • Mechanical dismantling with part-tagging and photographic record
  • Pressure part and structural steel dismantling
  • Piping, ducting and BOP disconnection
  • Electrical / instrument disconnection
  • Heavy-component handling, packing and protection

Frequently asked

1–2 weeks typically, depending on capacity and how much of the BOP is moving with it.

Flagged in the dismantling record — refractory rarely survives intact and is budgeted for replacement at re-erection, not treated as a surprise.

Yes — dismantling can be arranged as part of a Used Boiler Purchase, not only a full relocation project.

Need this scoped for your site?

Request a site survey, or call the breakdown desk if it’s active.