Boiler Revamp & Retrofit
Fuel Conversion
Switch fuels without switching boilers.
Fuel cost and availability shift faster than capital cycles. We convert boilers between coal, biomass, oil, gas and multi-fuel firing — engineering the grate, feed system and draft for the new fuel, not just swapping the burner.
What’s included
- Oil / gas fired to solid fuel fired conversion
- Coal to biomass, briquette or agro-waste firing
- Multi-fuel firing capability retrofit
- Biomass pellet burner retrofit — draft, ash handling, feed system
- Single-fuel to multi-fuel conversion
Frequently asked
Coal-to-biomass and multi-fuel retrofits are our most common conversions — confirm the specific combination you need with our engineering team before scoping.
It can, in either direction — biomass and multi-fuel conversions are assessed against current pollution control norms as part of the engineering scope.
3–6 weeks for a coal-to-biomass conversion, scheduled to your shutdown or off-season window.
Need this scoped for your site?
Request a site survey, or call the breakdown desk if it’s active.
More in Boiler Revamp & Retrofit
Division overview
Boiler Revamp & Retrofit →