Relocation & Reinstallation
Boiler Reinstallation
Erection, tie-ins and recommissioning at the new site.
Getting the boiler to the new site is half the job — reinstallation is where foundation readiness, alignment and tie-in accuracy determine whether commissioning goes smoothly or drags.
What’s included
- Foundation assessment and positioning
- Structural and pressure part erection, alignment
- Piping, fuel system and feedwater system reconnection
- Chimney / ducting and electrical / instrumentation integration
- Insulation and refractory reinstatement
- Testing and commissioning
Frequently asked
Civil work is typically your contractor's scope; we confirm foundation specifications during the survey stage so it's ready before equipment arrives.
Usually — refractory rarely survives dismantling and transport intact, so relining after re-erection is standard, not an add-on.
3–6 weeks from arrival to recommissioning, depending on how much of the BOP needs reconnecting.