Boiler Reinstallation

Erection, tie-ins and recommissioning at the new site.

Getting the boiler to the new site is half the job — reinstallation is where foundation readiness, alignment and tie-in accuracy determine whether commissioning goes smoothly or drags.

What’s included

  • Foundation assessment and positioning
  • Structural and pressure part erection, alignment
  • Piping, fuel system and feedwater system reconnection
  • Chimney / ducting and electrical / instrumentation integration
  • Insulation and refractory reinstatement
  • Testing and commissioning

Frequently asked

Civil work is typically your contractor's scope; we confirm foundation specifications during the survey stage so it's ready before equipment arrives.

Usually — refractory rarely survives dismantling and transport intact, so relining after re-erection is standard, not an add-on.

3–6 weeks from arrival to recommissioning, depending on how much of the BOP needs reconnecting.

Need this scoped for your site?

Request a site survey, or call the breakdown desk if it’s active.