Relocation & Reinstallation
Boiler Relocation
Dismantling, transport and re-erection, run as one project.
A boiler relocation is only as good as its weakest link — a rushed dismantling, a bad transport route, or a re-erection that doesn't match the original tie-ins. We run the whole sequence as one managed project.
What’s included
- End-to-end project management — dismantling through recommissioning
- Source and destination site survey
- Method statement covering permits, civil interface and schedule
- Single point of accountability across dismantling, transport and erection contractors
Frequently asked
So dismantling records, transport condition and re-erection all trace back to one method statement — fewer handoff gaps where damage or delay gets blamed on 'the other contractor.'
4–12 weeks door to door, depending on distance, permits and site readiness at the destination.
Yes — inter-state moves are common; the route survey and permit process accounts for the states in between, not just the endpoints.
Need this scoped for your site?
Request a site survey, or call the breakdown desk if it’s active.