Boiler Lifecycle Services
Shutdown Maintenance
Annual turnaround, executed to a fixed schedule.
Annual shutdowns run to a calendar the rest of the plant depends on. We plan the scope, mobilise ahead of the window, and hand the boiler back on schedule — not improvised once the boiler is already offline.
What’s included
- Planned shutdown maintenance and major overhaul
- Inspection and repair during the outage window
- Tube replacement and refractory work
- Piping modifications and valve replacement
- Auxiliary servicing and structural repairs
- Recommissioning before handover
Frequently asked
A pre-shutdown survey identifies the work list before the boiler comes offline, so the crew arrives with a method statement, not a blank slate.
Extra scope is flagged immediately with a revised timeline and cost — you decide whether it's done in this window or deferred.
4–6 weeks, so spares, crew and the method statement are confirmed before the window opens.
Need this scoped for your site?
Request a site survey, or call the breakdown desk if it’s active.