Boiler Lifecycle Services

Tubes leak, refractory spalls, burners fall out of tune — usually mid-shift. We cover the full maintenance lifecycle: 24×7 breakdown repair, scheduled preventive maintenance, annual shutdowns and overhauls, AMCs, and recommissioning after an outage — on any make of boiler, with IBR-compliant documentation throughout.

Services in this division

Scope of work

Maintenance & repair

  • Scheduled preventive maintenance and servicing
  • 24×7 emergency breakdown attendance and tube-leak repair
  • Pressure part renewal (water wall, superheater, economiser, headers)

Shutdowns & contracts

  • Annual shutdown, overhaul and licence-renewal support
  • Annual Maintenance Contracts (AMC) — boiler and boiler-house
  • Post-outage recommissioning and performance trial

Equipment we work on

Type

Makes

Capacity range

Water tube boilerall makes1–150 TPH
Fire tube / smoke tube boilerall makes500 kg/hr – 15 TPH
AFBC / CFBC boilerall makes5–120 TPH
Package boilerall makes1–25 TPH

How we execute

  1. Survey

    Site engineer inspects the asset, records nameplate data, failure history and access constraints.

  2. Method statement

    Written scope, standards referenced, manpower and duration, submitted for your sign-off before mobilisation.

  3. Mobilisation

    Crew, tooling and consumables dispatched from the nearest regional office.

  4. Execution

    Work carried out to the method statement, with NDT and hold-point inspection where the scope requires it.

  5. Handover

    Asset returned to service with a documentation package — inspection records, test certificates and IBR forms where applicable.

Documentation you receive

  • Site inspection report with photographs
  • Welder qualification records for repair work
  • Material test certificates for replaced parts
  • Hydrostatic test certificate (shutdown/overhaul scope)
  • IBR forms / repair intimation, where applicable

Typical turnaround

Single tube leak repair4–12 hrs
Multi-tube water wall replacement1–3 days
Annual overhaul, boiler <20 TPH3–5 days
Annual overhaul, boiler 20–100 TPH6–12 days

Frequently asked

Our breakdown desk dispatches within the hour. On-site arrival is typically within 24 hours across our core coverage cities; closer sites are faster.

Yes. We work on all makes — the repair method follows the pressure part standard and IBR requirements, not the OEM nameplate.

4–6 weeks before your planned shutdown window, so the method statement, spares and crew are confirmed before the shutdown starts.

An AMC bundles scheduled preventive maintenance, priority breakdown response and a fixed annual overhaul into one contract with a set price.

Both — O&M manpower, including IBR-certified boiler attendants, can be deployed on a standing or contract basis, separate from maintenance work itself.