Boiler Revamp & Retrofit
Boiler Modernisation
Bring the controls up to what the boiler is actually capable of.
Older boilers often run well below their real efficiency because the controls are older than the pressure parts. Modernisation replaces on/off control and manual tuning with modulating, monitored systems.
What’s included
- DCS / SCADA / PLC retrofit
- Modulating feedwater control, replacing on/off level control
- VFD retrofits on fans and pumps
- Online efficiency and flue gas monitoring
- Instrumentation upgrade across the boiler and BOP
Frequently asked
Much of it can be staged during short outages; final cutover and commissioning typically needs the boiler off load briefly.
Directionally yes for fans and pumps running below full load most of the time — the specific saving depends on your load profile and isn't quoted without site data.
2–4 weeks typically, including configuration, wiring and commissioning.