24×7 breakdown desk+91 90000 00000
Svedha Engineering

BOP & Utility Systems

Chimneys

Stack fabrication, erection and repair, sized to statutory height requirements.

Chimney height is part statutory minimum, part dispersion modelling — get either wrong and you're looking at a rebuild. We fabricate, erect, repair and relocate chimneys sized to your fuel, capacity and pollution control board norms.

What’s included

  • Chimney / stack fabrication and erection
  • Chimney repair and structural strengthening
  • Chimney modification for pollution control equipment integration
  • Chimney relocation as part of a boiler-house move
  • Chimney inspection

Frequently asked

Pollution control board norms set a minimum based on fuel and capacity; dispersion modelling can push it higher depending on surrounding terrain and structures.

Depends on whether it was sized with margin — checked as part of the capacity enhancement engineering scope.

Typically yes at the new site — handled as part of the statutory liaison during a boiler-house relocation.

Need this scoped for your site?

Request a site survey, or call the breakdown desk if it’s active.

Division overview

BOP & Utility Systems