24×7 breakdown desk+91 90000 00000
Svedha Engineering

Inspection & Engineering

Maintenance Audit

Is your maintenance program actually catching what it should.

A maintenance audit reviews your current maintenance practice against the failure modes your equipment actually has — often the gap between planned and reactive maintenance is where breakdowns keep recurring.

What’s included

  • Review of current maintenance schedule and records
  • Gap analysis against equipment failure history
  • Recommendations — AMC scope, inspection frequency, spares stocking
  • Input into a revised maintenance plan

Frequently asked

Common findings are inspection intervals that don't match actual failure rates, and reactive maintenance masquerading as a maintenance program.

Often — see Boiler AMC under Boiler Lifecycle Services, which can be scoped directly from the audit's findings.

Yes — they're complementary; a boiler audit looks at operating performance, a maintenance audit looks at the maintenance program itself.

Need this scoped for your site?

Request a site survey, or call the breakdown desk if it’s active.