Relocation & Reinstallation

Complete Boiler House Relocation

Not just the boiler — the boiler, BOP, utilities and structure together.

Moving only the boiler and leaving the auxiliaries behind means recommissioning against a BOP you have to rebuild anyway. We position this as one relocation: boiler, economiser, deaerator, fuel and ash handling, ducting, chimney, piping and structure, moved and re-erected as a matched system.

What’s included

  • Boiler, economiser and air preheater relocation
  • Deaerator, feedwater pumps and blowdown system relocation
  • Fuel handling and ash handling system relocation
  • ID/FD fans, ducting and chimney relocation
  • Steam, condensate and feedwater piping relocation
  • Structural steel, platforms and staircase relocation

Frequently asked

Auxiliaries are usually sized and tuned to the specific boiler — relocating them together preserves that match instead of forcing a re-engineering exercise with new local equipment.

Not always — the relocation feasibility assessment compares relocation cost against new equipment before you commit; see Relocation Feasibility.

8–16 weeks door to door, depending on distance and how much civil work the destination needs.