Complete Boiler House Relocation
Not just the boiler — the boiler, BOP, utilities and structure together.
Moving only the boiler and leaving the auxiliaries behind means recommissioning against a BOP you have to rebuild anyway. We position this as one relocation: boiler, economiser, deaerator, fuel and ash handling, ducting, chimney, piping and structure, moved and re-erected as a matched system.
What’s included
- Boiler, economiser and air preheater relocation
- Deaerator, feedwater pumps and blowdown system relocation
- Fuel handling and ash handling system relocation
- ID/FD fans, ducting and chimney relocation
- Steam, condensate and feedwater piping relocation
- Structural steel, platforms and staircase relocation
Frequently asked
Auxiliaries are usually sized and tuned to the specific boiler — relocating them together preserves that match instead of forcing a re-engineering exercise with new local equipment.
Not always — the relocation feasibility assessment compares relocation cost against new equipment before you commit; see Relocation Feasibility.
8–16 weeks door to door, depending on distance and how much civil work the destination needs.
Need this scoped for your site?
Request a site survey, or call the breakdown desk if it’s active.