Relocation & Reinstallation
Plant & Machinery Relocation
The same relocation discipline, applied beyond the boiler house.
Relocating a production line, a process unit or a power block follows the same logic as a boiler move at a larger scale — methodical dismantling, coordinated transport and recommissioning against a fixed schedule.
What’s included
- Machinery dismantling and equipment identification
- Site survey and dismantling planning
- Packing, heavy lifting and transportation coordination
- Reinstallation, alignment and piping reconnection
- Electrical and utility reconnection
- Trial runs and commissioning
Frequently asked
Thermic fluid heaters, pressure vessels, heat exchangers, pumps, compressors, reactors, storage tanks, conveyors and process machinery.
Yes — a full production line or power block relocation typically spans several equipment categories under one programme.
Long-lead items at the destination — foundations, utility tie-ins — are readied before equipment arrives, so nothing sits idle waiting on civil work.